MOQ: | 1000-10000pieces |
Price: | Negotiable |
Standard Packaging: | Sealed packaging |
Delivery Period: | 7-45 work days ,3-4 work days |
Payment Method: | T/T |
Supply Capacity: | On-demand supply ,In stock |
FKM GREEN sealing O-rings used in fuel injection systems
The high temperature and fuel-burning environment of the automobile engine put forward higher requirements for rubber seals. We have rich experience in the use of fluor rubber (FKM) seals in fuel injection and fuel delivery systems.
Material
|
FKM |
operating temperature | -20 °C to 280 °C. |
Main Application areas | chemical corrosion resistance and oil resistance. |
performance features | High temperature, corrosion and oil resistance |
function | hole seal, oil seal |
Why Choose Us
Q : Are you trading company or factory ?
A : We are a factory ,so we can offer you Factory Price with High Quality.
Q : How long is your delivery?
A : For stock items ,we can ship them immediately after receive payment .
For other items,we will need 20 days for mass production.
MOQ: | 1000-10000pieces |
Price: | Negotiable |
Standard Packaging: | Sealed packaging |
Delivery Period: | 7-45 work days ,3-4 work days |
Payment Method: | T/T |
Supply Capacity: | On-demand supply ,In stock |
FKM GREEN sealing O-rings used in fuel injection systems
The high temperature and fuel-burning environment of the automobile engine put forward higher requirements for rubber seals. We have rich experience in the use of fluor rubber (FKM) seals in fuel injection and fuel delivery systems.
Material
|
FKM |
operating temperature | -20 °C to 280 °C. |
Main Application areas | chemical corrosion resistance and oil resistance. |
performance features | High temperature, corrosion and oil resistance |
function | hole seal, oil seal |
Why Choose Us
Q : Are you trading company or factory ?
A : We are a factory ,so we can offer you Factory Price with High Quality.
Q : How long is your delivery?
A : For stock items ,we can ship them immediately after receive payment .
For other items,we will need 20 days for mass production.